This online basement remodeling cost calculator is here to give you a basic estimate for finishing your basement. Finishing your basement includes many different variables, so it’s a good idea to get a good idea of the cost as early as possible. Circumstances, materials, and the like can change over time, but a good “ballpark” estimate will give you a basic idea of where you’re starting from. We provide you with this calculator so you can get a better understanding of roughly what finishing your basement will cost.
Before using this basement remodeling calculator, understand that its pricing is based on a few basic assumptions about your floor. The calculator is assuming that you’re starting with a concrete floor in an unfinished basement. Anything beyond that, including removal of old flooring materials, is not taken into account in this estimate. You should keep this in mind.
How fast the job needs to be completed has a significant impact on the final price. A professional team can take a basement from framing to complete in about 45 days. A DIYer typically needs more time. If things need to be inspected, inspectors work on their own schedule, and if concrete needs to be poured, time must be allotted for it to properly set.
When putting a wall over a recently constructed frame, sheetrock is the industry standard for a paintable and more durable option. It can help insulate the room and generally lasts a long time when maintained. If you are trying to significantly drive costs down, go with paneling. It is very light, inexpensive and pre-finished in a variety of different sizes and types. Labor costs may also decrease because paneling is easier to transport and work with.
Putting down a floor in your basement offers a host of different options that will depend on your wants and needs more than anything else. Carpeting in the basement can easily be installed by any professional. Any type of carpeting can be installed in the basement and is often the most economical option. Another popular solution to flooring in the basement is the use of tile. Although tile is a more expensive option considering both material and labor costs, tile can be very visually appealing in your newly remodeled basement.
Get estimates from several companies; request and check references. Understand exactly what is (and isn't) included in each estimate, and whether the contractor will do the paperwork for required building permits. Ask about the contractor's length and type of experience, especially if there's anything unusual about your project. Be sure a company is properly bonded and insured and licensed in your state[10] . See if there are any complaints with the Better Business Bureau[11] .
The ceiling of this Connecticut basement was very unattractive. Wire, pipes, and insulation were exposed to the room below. Connecticut Basement Systems recommends installing a drop ceiling when finishing basements. These allow easy access to shut off valves, wires, and pipes that lead to the rest of the home. The tiles of our drop ceilings are made of mineral wool, making them completely inorganic. Mold can only grow on organic material, so mold or mildew will never be an issue on our ceiling tiles. They will not sag from moisture in the middle, giving an eternal crisp, clean finish. Our tiles even come with a 30 year warranty against mold and sagging. After the installation of the new drop ceiling, the basement was much brighter and had a clean appearance. The stylish crown molding around the perimeter of the room gives a beautiful transition to where the wall meets the ceiling.
Before walls and flooring can be added, the basement must first be professionally framed. Framing an unfinished basement can be very expensive; not only will it require a large amount of labor, but material costs are high as well. If you consider all the lumber your contractor will need to lay, plus crossbeams and studs, you will find that lumber is going to be one of the costlier aspects of the project.
Of that amount, $15,000 on the labor cost and the rest on material. all walls demolished, cracks in the wall fixed, then insulated and rebuilt, new windows, new electricity wiring, new floor tiling, new web bar, new stairs build from scratch replacing the old. Also, built two closets, one with shelves and the other for clothe-hanging, two utility rooms, one of them where the burner is fire proofed, all walls plastered and painted, wood stained etc. The contractor worked 10 hours a day and finished the entire project in five weeks! (I cooked lunch and provided cold drinks.) could have build a bathroom for $3000, but I decided to do that another time.
×