But beforehand you’ll want to prep the brick or masonry walls by building a simple wooden framework against them that you will use to attach the paneling or gypsum board (another name for sheetrock).Do that by attaching 2-inch by 2-inch furring strips to the walls. These are inexpensive and lightweight lengths of wood that look kind of like skinny versions of traditional two-by-fours.
The first step in finishing your basement it keeping it dry. Basements often deal with a lot of moisture vapor and hydrostatic pressure, which allow water into an unprotected basement. Because of this, any finished basement has to be waterproofed first. First, test your basement for moisture vapor so you know how much moisture you’re dealing with. There are homes tests you can do yourself or you can hire a professional to do the test for you.
Failure to obtain proper permits can result removing (demo-ing) any current finishing work or remodeling already installed. You could also face fines. A "stop work order" may be issued, which usually causes double the fees when you do, eventually, apply for the permit(s). If you have to file an insurance claim and can't produce any permits, the insurance company may deny the claim. Finishing a basement without permits also can affect the home's resale value.
Of that amount, $15,000 on the labor cost and the rest on material. all walls demolished, cracks in the wall fixed, then insulated and rebuilt, new windows, new electricity wiring, new floor tiling, new web bar, new stairs build from scratch replacing the old. Also, built two closets, one with shelves and the other for clothe-hanging, two utility rooms, one of them where the burner is fire proofed, all walls plastered and painted, wood stained etc. The contractor worked 10 hours a day and finished the entire project in five weeks! (I cooked lunch and provided cold drinks.) could have build a bathroom for $3000, but I decided to do that another time.
Remodeling a finished basement is costlier. The demo can cost from $1,500 to around $3,000 to prep the site. System upgrades include expanding the HVAC and electrical, but even if you already have a bathroom in place, remodeling can add $1,000 to $4,000. Finally, the finishing work can be kept low if you stay with the basics, but upgrades to hardwood floors and other luxuries will add $7,000 to $10,000 to the job. On average, expect to pay $13,200 to $30,500 for this job.

Very disappointed in this episode and the direction the show is headed. If you watch old episodes there is more focus on how things are built or fixed. Also focus on the correct way to do things. This episode skips over all the details of building. It is becoming just another fixerup tv show where you show the before, some shots of work being done, and then the finished project. You need to remember your roots of teaching homeowners the correct way to do things, even if they hire contractors to do the work. Your show has been successful for 40 years because you have always stuck to the same core values. It looks as though you are throwing them away to be just like every other show.
This before and after photoset is of a raised ranch basement. In the before picture you can see the outdated and unappealing wood paneling on the walls. The room also looks dark because the window is not allowing natural light to flow in. In the after picture you’ll see that our crew turned this dark and outdated basement into a bright, naturally-lit functional space.
How fast the job needs to be completed has a significant impact on the final price. A professional team can take a basement from framing to complete in about 45 days. A DIYer typically needs more time. If things need to be inspected, inspectors work on their own schedule, and if concrete needs to be poured, time must be allotted for it to properly set.
Sourcing supplies, clearing debris, and doing prep work can all help you save on basement costs. Consider what skills you have and talk with your contractor about what will shave money in each area. You may have the tools and strength to demo walls, which can save you several hundred dollars. Sourcing the materials for the pro takes this task off their labor time and saves you money. Doing prep work and finish work is also a way to cut down on total cost. Painting the walls yourself at the end of the project could save you hundreds of dollars. Negotiate all these aspects before signing your contract.
×